top of page

Needs Assessment Program

PROJECT  

HIGHLIGHT

Project Owner

Miami-Dade Water and Sewer Department 

 

Location

Miami-Dade County, FL

 

Main Services

  • Coordination with Design Consultants (5), FDOT, and other agencies

  • Public Outreach Scheduling

  • Permitting

  • Budget and Scheduling

  • Procurement services

  • Utility coordination

  • Construction management and inspection

  • Preliminary/conceptual design for water and sewer lines 

  • Hydraulic analysis 

  • ArcGIS

This program involved 40 separate water and sewer projects totaling $60 million in constructed value and involving design and construction of 17,815 linear feet of pressurized sewer force main from 4-inch to 12-inch diameter; 91,451 linear feet of 8-inch to 16-inch pressurized water main; 39,000 linear feet of 8-inch gravity sewer from 8-inch to 12-inch; and six pump stations.

 

*Staff Experience

© 2017 by 300 Engineering Group, P.A.

  • Instagram 300 Engineering
  • Facebook Social Icon
  • LinkedIn Social Icon
bottom of page